Daily Reporter
8 results found
-
Enter Daily Logs as Full Week logs
A feature needs created so that daily logs can be entered for a full week. This will save time. Entering each daily log separately is a ridiculous amount of wasted time. If this feature isn't available, then daily logs feature needs deleted or pulled from Payroll records. This system needs a lot of work.
1 vote -
Equipment Log
Add option to list Equipment with 0-hours used to keep equipment listed on the log
1 vote -
Weather
Remove the auto weather data for Submit Combined Daily to allow correct historical data be entered manually
1 vote -
Daily logs should extract employee information from certified payroll.
The daily logs should draw employee names and hours from the certified payroll drafts. Re-entering the information is not only ridiculously time-consuming, but it leaves so much room for error. At the very least, we should be able to edit daily logs after they're submitted so that if there is a discrepancy between the log and CPR draft, you can easily fix the problem and submit the payroll register rather than making all kinds of explanatory notes and waiting on the administrator to approve.
3 votes -
Daily Reporter - Quality Notes
more room for contractor to write in Quality Notes section
2 votes -
Daily Logs: Edit without needing them rejected / make it more intuitive to add employees
It would be nice to be able to edit a daily log. and an easier more user intuitive way to add multiple employees.
5 votes -
In Daily log, rename Draft button to Preview
In Daily reporter section for daily logs could the function block "Draft" be renamed to "Preview or Check". The logs save automatically right? People aren't using the draft button in my feedback. When I see draft I think save as draft. Preview explains what it will look like before submitting.
2 votes -
Edit Daily Log
Currently in the Daily Log Edit Form there are 4 fields identifying daily logs that can be edited. These are "Log Date" "Status" "Project Site" and "Shift". On jobsites with multiple scopes of work and Subcontract relationships adding the "Sub To | Contract ID" Field would greatly benefit workflows
1 vote
- Don't see your idea?